Go to Post As Alice once said: "Curiouser and curiouser!" - Mike Betts [more]
Home
Go Back   Chief Delphi > Competition > Off-Season Events
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
Reply
 
Thread Tools Rate Thread Display Modes
  #1   Spotlight this post!  
Unread 10-10-2001, 15:09
kmcclary's Avatar
kmcclary kmcclary is offline
Founder 830/1015;Mentor 66/470/1502
FRC #0470 (Alpha Omega Robotics)
Team Role: Engineer
 
Join Date: Aug 2001
Rookie Year: 1994
Location: Ann Arbor, MI
Posts: 491
kmcclary has a reputation beyond reputekmcclary has a reputation beyond reputekmcclary has a reputation beyond reputekmcclary has a reputation beyond reputekmcclary has a reputation beyond reputekmcclary has a reputation beyond reputekmcclary has a reputation beyond reputekmcclary has a reputation beyond reputekmcclary has a reputation beyond reputekmcclary has a reputation beyond reputekmcclary has a reputation beyond repute
Electrical connections and multimotor mechanisms

Does the "no switches" basically apply to commercial switches?

Complex mechanisms often have safety or sequencing "devices" to allow for proper positioning.
Can we use allowable materials to create something that will make, break or change simple electrical connections based on physical position of one mechanism section (such as an end of travel condition) to enable or disable a second motor on a single Spike channel? This allows for motor "motion sequencing" in a complex mechanism by pushing one button, or attaining a proper actuator position even if operator visibility is blocked.

For example, can we use two pieces of copper pipe coming in contact with each other (or separating) to start or stop a second motor attached to the same Spike channel once a certain position is reached, or to disable it so it won't try to move something else for mechanism safety? In essence,
may we homebrew connections of ANY kind?

Thanks!
- Keith McClary, Huron High Team 830
__________________
Keith McClary - Organizer/Mentor/Sponsor - Ann Arbor MI area FIRST teams
ACTI - Automation Computer Technologies, Inc. (Sponsoring FIRST teams since 2001!)
MI Robot Club (Trainer) / GO-Tech Maker's Club / RepRap-Michigan) / SEMI CNC Club
"Certifiably Insane": Started FIVE FRC teams & many robot clubs (so far)!
2002: 830 "Rat Pack" | 2003-5;14: 1015;1076 "Pi Hi Samurai" | 2005-6: 1549 "Washtenuts"/"Fire Traxx"
2005-(on): 1502 "Technical Difficulties" | 2006-(on): FIRST Volunteer!
2009-(on): 470 "Alpha Omega" | WAFL | Sponsor & "Floating Engineer" for MI Dist 13 (Washtenaw Cnty)
2011: 3638 "Tigertrons" | 2013-(on): 4395 "ViBots" | 2014-(on) 66 "Grizzlies"
"Home" Teams: 66, 470, 1076, 1502, 4395
Local FIRST alumni at or coming to Ann Arbor (UM/EMU/WCC/Cleary)?
...We Want YOU as a Mentor! Please email me for info!
Support CDF Reputation - If a posting helped, thank 'em with rep points!
"It must be FRC build season when your spouse and children become 'Action Items 8 & 9'..."
Reply With Quote
  #2   Spotlight this post!  
Unread 11-10-2001, 11:10
Joe Johnson's Avatar Unsung FIRST Hero
Joe Johnson Joe Johnson is offline
Engineer at Medrobotics
AKA: Dr. Joe
FRC #0088 (TJ2)
Team Role: Engineer
 
Join Date: May 2001
Rookie Year: 1996
Location: Raynham, MA
Posts: 2,633
Joe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond repute
Official

Sorry, No.

Safety, simplicity and our inspector's sanity are our primary concerns.

I know that this rule limits some creativity, but we feel that it is best not to allow this at this time.
Reply With Quote
  #3   Spotlight this post!  
Unread 11-10-2001, 14:15
kmcclary's Avatar
kmcclary kmcclary is offline
Founder 830/1015;Mentor 66/470/1502
FRC #0470 (Alpha Omega Robotics)
Team Role: Engineer
 
Join Date: Aug 2001
Rookie Year: 1994
Location: Ann Arbor, MI
Posts: 491
kmcclary has a reputation beyond reputekmcclary has a reputation beyond reputekmcclary has a reputation beyond reputekmcclary has a reputation beyond reputekmcclary has a reputation beyond reputekmcclary has a reputation beyond reputekmcclary has a reputation beyond reputekmcclary has a reputation beyond reputekmcclary has a reputation beyond reputekmcclary has a reputation beyond reputekmcclary has a reputation beyond repute
Thanks

OK. That's fair.

**NOW** that it is ruled illegal, I'll talk about some of the things we were considering. <grin>

1) We were running out of control channels, but we still wanted a set of "deployment" widgets running.

The biggest problem with deployment widgets that use motors or pumps is that if you simply try to parasitize another channel it may try to "undeploy" if the channel is run the other way, UNLESS you can break the circuit to the deployment device at End Of Travel (EOT).
That requires some kind of a switchlike device.

But then, we thought of THE GUMBALL CHANNEL... <grin> What the hey... It's a channel that comes on at powerup, and stays on in one direction throughout the round. It was PERFECT for using for deployment! <grin>

The only problem was that we had to have some way for the devices to sequence or stop themselves at EOT (End Of Travel), or else they'd pop breakers, drain power from other things, or simply run our batteries down.

That's why we needed a way to shut them down or sequence them when they reached their final position, and hoped we could attach a power wire to a metal & plastic piece of the mechanism.

When the power comes on, the mechanism would then sequence or simply run out, and automatically stop when it reached end of travel when the mechanics broke the power circuit.

It was a VERY simple way to guarantee the machine's transformation devices would deploy INSTANTLY upon startup AND maintain it, without operator action. If it was ever "pushed in" during the round, it would simply automatically power itself up again and restore it's deployed position. (Neat! :-) The "automatic powerdown" aspect of breaking a circuit insured it wouldn't drain the batteries or pop a circuit breaker.

But best of all, it would have saved us a Spike channel. Too bad it's illegal!! <darn>

Another use we were considering would be for one Spike channel to run a pair of motors in a sequenced mechanism. For example an arm can then reach "up", AND "out" in sequence to drop a jug into the goal with only a single channel of Spike by overlapping their control zones by making a pair of primitive conductive cams and brushes with some plastic sheeting, conductive metal, and a wire or conductive metal "brush" on the elbow and shoulder joints. Squeeze the trigger, and the thing rises up and out in one motion, on one Spike.

If we stick with that concept, we'll have to do it with multiple Spike channels now. But thanks for considering it, and being so prompt with a reply! We're freezing our design soon, and do appreciate your quick responses!

- Keith McClary, Huron High Team 830
__________________
Keith McClary - Organizer/Mentor/Sponsor - Ann Arbor MI area FIRST teams
ACTI - Automation Computer Technologies, Inc. (Sponsoring FIRST teams since 2001!)
MI Robot Club (Trainer) / GO-Tech Maker's Club / RepRap-Michigan) / SEMI CNC Club
"Certifiably Insane": Started FIVE FRC teams & many robot clubs (so far)!
2002: 830 "Rat Pack" | 2003-5;14: 1015;1076 "Pi Hi Samurai" | 2005-6: 1549 "Washtenuts"/"Fire Traxx"
2005-(on): 1502 "Technical Difficulties" | 2006-(on): FIRST Volunteer!
2009-(on): 470 "Alpha Omega" | WAFL | Sponsor & "Floating Engineer" for MI Dist 13 (Washtenaw Cnty)
2011: 3638 "Tigertrons" | 2013-(on): 4395 "ViBots" | 2014-(on) 66 "Grizzlies"
"Home" Teams: 66, 470, 1076, 1502, 4395
Local FIRST alumni at or coming to Ann Arbor (UM/EMU/WCC/Cleary)?
...We Want YOU as a Mentor! Please email me for info!
Support CDF Reputation - If a posting helped, thank 'em with rep points!
"It must be FRC build season when your spouse and children become 'Action Items 8 & 9'..."
Reply With Quote
Reply


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Frame connections manleycor Technical Discussion 15 18-11-2003 01:14
Drill Motor Connections archiver 2001 8 24-06-2002 00:49
What else do we want? archiver 2000 63 23-06-2002 23:19
FIRST @ Michigan Tech. archiver 2000 14 23-06-2002 22:44
Legal connections to Air Pumps kmcclary Off-Season Events 1 11-10-2001 10:12


All times are GMT -5. The time now is 16:22.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi