|
|
|
![]() |
|
|||||||
|
||||||||
...somewhere in the Pacific Northwest, work continues on this top secret device.
Extensive design work has led to the near-completion of this key robot feature. Come March, it'll be rockin' the competition Regan style -- you provide the pea soup.
08-02-2004 19:47
Wetzel
I see what appears to be a cherry picker...
Anyone else going with something like that? Being able to get that much higher above the goal to drop the ball onto the goal vs grabing the ball from the side?
Pnumaticly opened cherry picker...hrmm. Looks overly robust, but that means it shouldn't (and therefor will) break.
We used cabling on rollers on our slidling lift system in 99. It was designed to be gravity loaded, so it comes off all the time now that the lift is the only thing left from that robot. 
Wetzel
08-02-2004 22:28
Madison
|
Originally Posted by Wetzel
I see what appears to be a cherry picker...
Anyone else going with something like that? Being able to get that much higher above the goal to drop the ball onto the goal vs grabing the ball from the side? Pnumaticly opened cherry picker...hrmm. Looks overly robust, but that means it shouldn't (and therefor will) break. We used cabling on rollers on our slidling lift system in 99. It was designed to be gravity loaded, so it comes off all the time now that the lift is the only thing left from that robot. ![]() Wetzel |