|
|
|
![]() |
|
|||||||
|
||||||||
This picture was taken Saturday night, before the battery cables and 120A breaker were added. Sunday, we continued wiring the RC (backup battery and connections to the breaker panel), and mounted the tower onto the robot. Tomorrow, we'll wire up the motors and tie down a few more of the wires.
14-02-2005 13:23
SpaceOsc
ahhhs very nice looking pwm wiring, had a lil trouble myself. u have 6 victors near each other but each of them only have seemly less than inch of cooling clearence from the plastic thats not good. and your fuses seem kinda hard to get tooo. will your radio go on top tooo to make it completely self contained?
Very Impressive Looking!!
14-02-2005 13:36
Andy A.|
Originally Posted by SpaceOsc
ahhhs very nice looking pwm wiring, had a lil trouble myself. u have 6 victors near each other but each of them only have seemly less than inch of cooling clearence from the plastic thats not good. and your fuses seem kinda hard to get tooo. will your radio go on top tooo to make it completely self contained?
Very Impressive Looking!! |
14-02-2005 14:46
Ready_MixI wish I had that much space for my electrical board... I was alotted a 7.5" by 34" area. somehow I managed to make it work. I'll post some pics of it later.
14-02-2005 16:28
Erin Rapacki
Looks great! But, how much does it weigh?
14-02-2005 16:51
Emily Pease
|
Originally Posted by Erin Rapacki
Looks great! But, how much does it weigh?
|
14-02-2005 17:22
Greg Marra
Umm, is that tape?
Adhesive tape is illegal... I'd go with some more holes in the board and some zip ties.
14-02-2005 19:20
MikeDubreuil
|
Originally Posted by Greg Marra
Umm, is that tape?
Adhesive tape is illegal... I'd go with some more holes in the board and some zip ties. |
14-02-2005 19:26
Greg Marra
|
Originally Posted by MikeDubreuil
Where do you see the adhesive tape?
As of right now we are well within our weight allowances. Therefore, we'd prefer to keep the structural integrity before we go blowing holes in it just so that we can say we took 6 ounces out of it. Just an engineering decision ![]() |
14-02-2005 19:38
MikeDubreuil
|
Originally Posted by Greg Marra
I was just suggesting the holes as things to put zip ties through to replace what I thought was tape. It's probably just my unfamiliarity with this stuff, but it looked to me like tape was used to hold some wires to the bottom of the topmost layer of the tower. I have it pointed out in this image.
If that stuff isn't tape, what is it and what is it's purpose? I am just a rookie, after all. |
14-02-2005 21:13
scifi3018now i may only be a 4 year vetran, and i may only have 20/20 vision, but are those victor 883's on your board? i thought the rules specified only 884's
but i could just be seing things, that just jumped out when i saw them...
14-02-2005 21:35
Emily Pease
|
Originally Posted by Greg Marra
I was just suggesting the holes as things to put zip ties through to replace what I thought was tape. It's probably just my unfamiliarity with this stuff, but it looked to me like tape was used to hold some wires to the bottom of the topmost layer of the tower. I have it pointed out in this image.
|
|
Originally Posted by scifi3018
now i may only be a 4 year vetran, and i may only have 20/20 vision, but are those victor 883's on your board? i thought the rules specified only 884's
|
14-02-2005 23:01
scifi3018sorry my bad, didnt know they came in multiple shades, gonna have to order some more to color code them with the bot 
15-02-2005 01:32
5dimes
my electrical group had a similiar panel idea for our electrical box, but we were afraid we would have problems accessing everything. SO we thought of pullable panels, but then we'd have to deal with fuss over moving wires. from the looks of yours, everything seems dandy.
15-02-2005 08:25
DarkJedi613
How well protected will all that be once its on your robot?
Also it seems like some of those things are hard to remove...how easy do those speed controllers come out in the event of replacing?
15-02-2005 10:04
Emily Pease
|
Originally Posted by DarkJedi613
How well protected will all that be once its on your robot?
Also it seems like some of those things are hard to remove...how easy do those speed controllers come out in the event of replacing? |