|
|
|
![]() |
|
|||||||
|
||||||||
I decided to use my VEX kit make a robot for Triple Play. This is the robot BEFORE extending it's 3 part arm.
I can't believe it actually worked...
17-04-2005 13:15
IMDWalrusI think it'd work better if it wasn't smaller than a tetra.
I know that the robot wasn't designed to be out competiting with the bigger bots, but two questions come to mind: how big is it (dimensions and weight, maybe) and how much can its arm support?
17-04-2005 13:27
Greg Needel
ladies and gentlemen this is a teaser to next years game "dance dilemma" where you have to use the vex kits to move ballet shoes around the floor... 
17-04-2005 17:02
Not2B
It wasn't built so much to play a game, but more to see if it could be done. Like climbing Mt. Everest.
The largest of the aluminum square tubes is 1/4 inch X 1/4 inch. It only gets smaller from there. It will lift our bamboo skewer tetras.
The fishing line (5 or 7 lbs test) is streaching a bit too much for my taste, so I'm going to try and find some better stuff.
It's a continuous loop, so the retract is easy. I have both extend and retract on the same shaft. I drilled holes in the shaft to attach the fishing line.
I learned A LOT from this little experiment:
- How to thread small wires through tight places
- How to make a continuous extending set of tubes in a simple mannor (come on, it HAD to be simple.)
- How to wire it all up.
I also considered making a hybrid continuous / cascade system. I might not have the room/skill/finger dexterity to that though...
The slipper might be too heavy to lift - didn't try. It does scare the dog half insane.
17-04-2005 20:15
tiffany34990it looks pretty cool!
how long did it take you to assemble and program?
17-04-2005 22:01
Not2B
To program: 0 seconds. The VEX kits don't have programming YET. So it was very easy.
To put the base together: About 1 hour
To put the arm together: 1 hour.
To build it, I used a very tiny (not sure the size) drill bit to place holes into the large and small tubes. I placed a slot in the medum tube with a dremel cut-off wheel. It took 20 minutes just to thread the fishing line. I had to use a tiny set of files to trim the flash (I work with plastic) off the holes and slots.
The servo to move it up and down, and a VEX motor to run the winch.
Building ships in bottles was good training for this. It is kind of fragile.