Well after 2 weeks we not have the wiring all done on the robot. It will let the programers, finally, go at it and well it took 4 hours. Man it looks nice though. (sorry for the bad quality I had to use my cell)
18-01-2008 21:30
Schnabel
The only thing that I wonder about is why you guys choose metal as a base. I would be worried about wires coming uncrimped (/sp) and then shorting out on it.
18-01-2008 21:32
vhcookInteresting. You seem to have divided the Rockwell block into two sections. I don't think there's anything wrong with that, but I'm curious why you made that design decision. Did you get an extra grey end-block for the far end (which is out of the shot) so that you don't have to worry about the black blocks sliding?
I'm assuming your master breaker is also at the far end there.
Are you sure you will have enough room to get the serial cables in and out of the robot controller once this is mounted on/in your chassis? Plugging them straight in needs about 3.5" of clearance, as I recall (although there is the option of right-angle serial adaptors to get you out of that problem).
Where does your backup battery sit?
You've got a fairly clean wiring job there. It looks very nice. 
18-01-2008 22:01
AJ RIt looks really nice. Someone must have spent a lot of time making the wires look neat.
It looks like the two maxi blocks are connected through one another. Is this right? It if is, then according to R50, there has to be another 6 awg wire connecting it to the Rockwell distribution block.
<R50> The 12V battery, the main 120-amp circuit breaker, the power distribution block, and circuit
breaker distribution panels shall be connected as shown in the 2008 Power Distribution
Diagram. In particular:
The battery must be connected to the ROBOT power system through the use of the
Anderson Power Products (APP) connector.
The APP connector must be attached to the battery with either the copper lugs provided
in the FCI Burndy Bag or appropriate crimp-on lug connectors.
The battery terminals and the connecting lugs must be insulated with shrink tubing
and/or electrical tape.
The main 120-amp circuit breaker must be directly connected to the hot (+) leg of the
ROBOT-side APP connector. Only one 120 amp main circuit breaker is allowed. This
breaker must not be bypassed.
The power distribution block must be directly connected to the APP connector and main
120-amp circuit breaker. No other loads may be connected to the main 120-amp circuit
breaker.
All circuit breaker distribution panels must be connected directly to the power
distribution block. No intermediate connections are permitted.
Additional lengths of #6 red and #6 black wire may be used to reach the panels as
needed to make the above connections.
Circuit breakers must be accessible for inspection at each FIRST Robotics Competition
event.
Oh, and why do you need eight 40 amp loads?
18-01-2008 22:31
MasterMkanikWhat do you need eight speed controllers for? We have half that!
19-01-2008 00:43
popo308|
What do you need eight speed controllers for? We have half that!
|
19-01-2008 00:51
Bochek|
The only thing that I wonder about is why you guys choose metal as a base. I would be worried about wires coming uncrimped (/sp) and then shorting out on it.
|
|
Interesting. You seem to have divided the Rockwell block into two sections. I don't think there's anything wrong with that, but I'm curious why you made that design decision. Did you get an extra grey end-block for the far end (which is out of the shot) so that you don't have to worry about the black blocks sliding?
|
|
Are you sure you will have enough room to get the serial cables in and out of the robot controller once this is mounted on/in your chassis? Plugging them straight in needs about 3.5" of clearance, as I recall (although there is the option of right-angle serial adaptors to get you out of that problem). Where does your backup battery sit? |
19-01-2008 00:54
beemgruemWe just have 3 speed controlers and 2 spikes right now.. I don't understand how you guys can use 8 or 10??
19-01-2008 00:55
Bochekalso, if you look carefully you can see that it is sitting on our digital scale.
9.7lbs (includes everything except a battery.
19-01-2008 01:01
technoL|
We just have 3 speed controlers and 2 spikes right now.. I don't understand how you guys can use 8 or 10??
|
19-01-2008 01:06
beemgruem|
If you're running your drive train with 2 CIMs on each side, that uses up the 4 victors that came in the kit. Then another for any other motors that you'll need for your manipulator or lift system or whatever other mechanism. Also, some teams install a spare 1 or 2 in case one gets smoked during a match it can easily be rewired to a fresh one.
|
19-01-2008 01:08
beemgruemOh never mind
Sorry about my bad english.. We are using 2 omni wheels so we are actually connected just 2 of our wheels to CIMs.. So that is okay now
19-01-2008 01:14
BochekWhat you are missing that will help explain what your reading, is that we have 4 CIM's powering our drive train, that uses 4 victors, we also have 4 victors for the manipulator. Notice the lack of pneumatics and spikes?
- Bochek
19-01-2008 01:15
EricH
|
For my drive train don't I need 2 victors for just 2 CIMs? Am I wrong? Why would I need 4?? And we are having 1 for our lifting actuator.. So that shows three? I am just lost for 2 CIMs for 4??
And also it is a good idea to just replace it.. I think I will use it.. |