Go to Post Someone should make FIRST fortune cookies, because I think I just thought of a good one. - artdutra04 [more]
Home
Go Back   Chief Delphi > CD-Media > Photos
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

photos

papers

everything



Electrical hasn't gotten to the bridge yet so...

By: NetPlanet
New: 31-01-2011 21:31
Updated: 31-01-2011 21:31
Views: 1346 times


Electrical hasn't gotten to the bridge yet so...

The programming team wanted to setup and test the wireless, but the electrical team has not yet setup the 12Vdc/5Vdc adapter. So extra battery + DC/AC adapter + velcro = success!

Recent Viewers

  • Guest

Discussion

view entire thread

Reply

07-02-2011 21:44

jsmith296


Unread Re: pic: Electrical hasn't gotten to the bridge yet so...

Wow, the chassis guy who built that robot must have really put in a lot of time and effort to build that robot for his programming team....

Well done unknown chassis captain..



07-02-2011 22:09

MathFreak


Unread Re: pic: Electrical hasn't gotten to the bridge yet so...

Quote:
Originally Posted by jsmith296 View Post
Wow, the chassis guy who built that robot must have really put in a lot of time and effort to build that robot for his programming team....

Well done unknown chassis captain..
nice :/
it worked well...
but it had too much weight... 2 batteries is heavy!



07-02-2011 22:12

MagiChau


Unread Re: pic: Electrical hasn't gotten to the bridge yet so...

Wait? Electrical isn't your programming team? Programming team spent all of today setting up the electrical for the 2011 bot instead of testing or doing programming. We still need to attach more wires for additional motors and other misc. stuff before plugging in camera, accelerometer, gyro, encoders etc.



07-02-2011 22:31

MathFreak


Unread Re: pic: Electrical hasn't gotten to the bridge yet so...

Quote:
Originally Posted by ZonChau View Post
Wait? Electrical isn't your programming team? Programming team spent all of today setting up the electrical for the 2011 bot instead of testing or doing programming. We still need to attach more wires for additional motors and other misc. stuff before plugging in camera, accelerometer, gyro, encoders etc.
It is.... there are 2 people (including me) who are actually working on programming and there is 1 mentor for programming and the 2 people is in electrical too



08-02-2011 01:11

Al Skierkiewicz


Unread Re: pic: Electrical hasn't gotten to the bridge yet so...

Mike,
Before you take another picture, can you please insulate all the battery wiring terminals? The battery is capable of welding if a dropped tool falls across the bare metal. That dead short will get extremely hot, extremely fast and will damage the battery, possibly to the point of injuring someone. Inspectors are asked to stop any inspection until all terminals are insulated.



08-02-2011 03:15

sanddrag


Unread Re: pic: Electrical hasn't gotten to the bridge yet so...

Quote:
Originally Posted by Al Skierkiewicz View Post
Inspectors are asked to stop any inspection until all terminals are insulated.
Good. You wouldn't believe how many times in the past I'd find teams without insulated terminals. And at times, I thought I was the only inspector checking. I made teams show me all their batteries.



08-02-2011 07:42

Al Skierkiewicz


Unread Re: pic: Electrical hasn't gotten to the bridge yet so...

Quote:
Originally Posted by sanddrag View Post
Good. You wouldn't believe how many times in the past I'd find teams without insulated terminals. And at times, I thought I was the only inspector checking. I made teams show me all their batteries.
Please add "show me all your chargers" as well.



09-02-2011 21:33

NetPlanet


Unread Re: pic: Electrical hasn't gotten to the bridge yet so...

Quote:
Originally Posted by Al Skierkiewicz View Post
Mike,
Before you take another picture, can you please insulate all the battery wiring terminals? The battery is capable of welding if a dropped tool falls across the bare metal. That dead short will get extremely hot, extremely fast and will damage the battery, possibly to the point of injuring someone. Inspectors are asked to stop any inspection until all terminals are insulated.
We use transparent shrink rap on the terminals so that we could easily inspect the connections. It's hard to see in the photo.



09-02-2011 22:18

Al Skierkiewicz


Unread Re: pic: Electrical hasn't gotten to the bridge yet so...

Quote:
Originally Posted by NetPlanet View Post
We use transparent shrink rap on the terminals so that we could easily inspect the connections. It's hard to see in the photo.
Excellent!



09-02-2011 22:54

RoboDawg


Unread Re: pic: Electrical hasn't gotten to the bridge yet so...

Nice! I thought we were the only team to use transparent heat shrink for the same reason! ( P.S. It also gives the inspectors something to catch until they see that it IS insulated.)



view entire thread

Reply
previous
next

Tags

loading ...



All times are GMT -5. The time now is 07:55.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi