2023 field lumber list?

Shouldn’t we have the list by now? Did I just miss the release?

4 Likes

I’ve been checking the blog every couple of hours since Monday.

Haha Jokes on you its just a completely flat field with tape /s

11 Likes

*retroreflective tape on the completely flat field. No carpet this year.
Source

11 Likes

I mean 2014 was a pretty good game

3 Likes

Expect it just before Christmas, or maybe just after. That’s when it usually comes out.

1 Like

Looks like last year’s was posted on Dec 16th. I’d give it around another 2 weeks before I really started wondering where it is.

1 Like

I saw the leaked list - here it is in part:

(2) 500-count bags of 100lb Black Zipties
14yds (approx) Hook and Loop

11 Likes

Hey, GDC, you seem to be ripping off my team’s BoM! (We’re honored to be copied by greats, of course.)

2 Likes

4 Likes

You’re clearly not looking at the correct list. Here’s what I saw:

  • 30 kilometers 3d printer filament.
  • 18 rolls Duct Tape
8 Likes

Not so sure about that. I saw
250lbs of 1/8 in blue plastic pellets
Empty 5 gallon heavy duty water jugs.

2 Likes

I thought the list had
4 kiddie pools
8 beach balls
And those floating basket ball hoops

Or I at least tell myself water games are going to happen

11 Likes

Any news?

150 Gallons of water, 25k zipties, 28miles of hook and loop, and 100miles of reflective tape

3 Likes

Don’t forget the 2 kiddy plastic pools.

The robotics Ironman. Swim, Bike, Run!

I think you need 112 miles of reflective tape though. The 28 miles of hook and loop
does cover the marathon course. The pool is kind of limiting however, to make it 2 miles swimming, you need 80k 40k gallons to fill the robot width x 1 foot depth pool.

edit: There and back.

looks like there won’t be one this year

3 Likes

Last year’s list (while rather extensive) didn’t have any unique materials. It was 4x4, 2x4, plywood and steel pipe. I wonder what are field materials you could easily purchase a big-box home improvement store but which would also give away some aspect of the game.

Interesting

3 Likes

Really not a fan of this! We gad planed on making an order and have all the material delivered the week prior so we could have feild elements as soon as possible. All this does is delay that another day or 2

2 Likes