pic: Delta field at River Rage - DS area



Driver’s station operator deck is 0.50" plywood, velcro on top to save your DS from robot impacts. COTS hinges, electrical tubing holds up the deck.

The driver stations is probably the only area which seems to need some more work. The platforms is not too sturdy and does flex when pressured(when you have two joysticks pushed all the way forwards while pinning, the fact that the table is getting lower is a pain). And when you lift your board off of the velcro, the platform comes up with it, and takes some pushing to get it back down.

Other than that, the Delta field was really nice, loved the wider gates.