what type of setup do you guys have for network rendering?
for modeling we have two machines with 128mb geforce4’s and then about 5 machines ranging from 700mhz-2.4ghz. I brought my desktop down to our workstation and have my laptop to work from home, and we should have a nice array come rendertime. hopefully something close to 15-20 pretty powerful machines:D
p.s. how did you get that kind of power…school bought or sponsor bought?
My school got a new computer lab over the summer… we put an addition on and they decided “what the heck, lets get some kickin’ computers”, so they got those… yesterday i finally got an “OK” from my mentor to use those comps for netrendering… even tho i’ve been bugging him since the first day of school… AHHHHHHHHHHHHH 23 XEON 2GHZ w/ 1 gb of rdram AHHHHHHHHHHHHHHHHHHHHHHHHH
raytrace wont be a problem
who cares about polygons?
motion blur? ha we dont have to fake it anymore
oh yeah, we can use all those inventor models i’ve made over the years too…
*Originally posted by RobDeCotiis *
**My school got a new computer lab over the summer… we put an addition on and they decided “what the heck, lets get some kickin’ computers”, so they got those… yesterday i finally got an “OK” from my mentor to use those comps for netrendering… even tho i’ve been bugging him since the first day of school… AHHHHHHHHHHHHH 23 XEON 2GHZ w/ 1 gb of rdram AHHHHHHHHHHHHHHHHHHHHHHHHH
raytrace wont be a problem
who cares about polygons?
motion blur? ha we dont have to fake it anymore
oh yeah, we can use all those inventor models i’ve made over the years too… **
Me thinks old robby boy there outta be letting other teams use his “mad lab skillz” heh, wadda ya think there?
If not…don’t be surprised if the south florida teams hunt your school down and the comps are magically gone later…The broward school system dosent exactly lend itself to allow us to buy jacked up machines…
8 x 1.8 GHz Pentium 4’s - main render farm for raytracing and fancy envrionment fx
16 x 667 MHz Pentium 3’s - secondary render farm for rendering test scenes and simple renders
1 x 1.4 GHz Athlon - used as a controller for back burner and some modelling
1 x 900 MHz Athlon - used as another controller/modelling machine
We didn’t use all of them, but we did have 50 x P4 2.26 GHz available.
Now since BobPg3 was bragging about hard drives, I just have to let you know: we had 575 GB of space available, on our school network’s P: drive, made exclusively for us!
My box is:
Black Cheiftec Aluminum case with a window preinstalled
Antec TruePower 430W
Athlon XP 2100+
Asus A7N8X (nForce2)
512MB DDR333
Western Digital 80GB (8MB Buffer! WOOT!)
GF4 Ti4200 64MB drumroll please Hitachi Superscan Elite 21" monitor!
I’ve only had it two months… when I get some more money, I’m going to be modding so much, this baby’s gonna purr…
… loudly… 4x 55 dB fans.
Alrighty, after a meeting with Tom Mitchell (Dell’s State of Florida Education rep), who is btw a great guy, we’ve got 26 machines coming in with these specs: Dual Xeon 2.4 ghz 512k on-die cache FSB 533 (I think thats the FSB…), 1 gig of DDR, 40 gig and 120gig HDs, ATI Fire 64 Meg video cards (I made them redo the quote 3 times to get a CAD-class video card ), Gigabit network cards, DVD+RW drives (okay…so that was just a brag…), and 19" CRTs for all of them coming in. Those are all for the visual computer modeling class (which btw, with a class like that, can someone please explain WHY I did the animation mostly by myself???)
We’re also getting 53 p4 2.2 ghz machines for the proggramming lab and electronics lab…but im thinking of installing hte max server renderer on tehm as a service, and render overnight on those when no one’s using them.
Also, we’re getting 3 Dell PowerEdge 2650 servers. Two are going to run my Windows 2000 Active Directory Services and one is going to be an application server. Ill probobly deploy the backburner manager to that also.
Then, we’re getting a Network Attached Storage Device with 3 146 gig hard drives, SCSI 320, all raided together. With any luck at all, this will also be on a gigabit network (we also have fiber optics running through our entire building).
So yeah…thats what I’m up to…
(Btw…our plans for this building got soo cool, that our reps started bringing their friends from the office to our meetings to see what we’re doing…)
i didnt do animation this year because i was too busy building the bot… the kid that was in charge of animation didn’t get it done too bad… maybe next year they’ll make a nice anim on time… :-/ o well…