Background:
My district is totally bought into having a STEAM (stem + art), space to upgrade our facilities into the 21st century (I know…we are already there).
I am aware of all the machinery I’d like for my team (cnc’s, lathes, mills, welding areas, saws, etc.) and that I’d like a dedicated CAD, field, and assembly areas. Also storage solutions for parts, raw materials. And a space for class type space (desks etc).
Overall I need to put together a wishlist of things, and I pretty much have full reign on the layout and flow of this.
To get the space reconfigured and/or built/extended, I want to sell this as a district engineering/robotics center.
Question:
If anyone has had a space redesigned with FIRST and/or robotics in mind, would you mind sharing the layout/design with me? I am having trouble finding great layouts for this type of space. Pictures/plans would be great.
Our school/team is also looking at creating a large space. There is some talk about turning some of the old Grumman facilities into a space. Being our close proximity we will probably face similar challenges. Ours is a little farther off though than yours at first glance.
If you need any help we would be very willing to assistant your team in creating the space.
Wow. 624 is exactly what I was thinking. I would love to get my hands on the layout. I am trying to piece it together from the pictures on the websites.