My team is considering wrapping PVC (~1" OD) in surgical tubing for intake and conveyor system. Any tips for this process?
From my head cad it seems like water and a hell of a lot of patience is required.
My team is considering wrapping PVC (~1" OD) in surgical tubing for intake and conveyor system. Any tips for this process?
From my head cad it seems like water and a hell of a lot of patience is required.
Leave it to 1678 to already have my robot question solved and well documented
This topic was automatically closed 365 days after the last reply. New replies are no longer allowed.